COUNCIL OF FEDERATION (STATE DUMA) OF THE FEDERAL ASSEMBLY OF THE RUSSIAN FEDERATION OF THE FIFTH CONVOCATION DEPUTY OF COUNCIL OF FEDERATION (STATE DUMA) (2008 – 2011)
We are glad to inform you that SIMEM participated with its Represenatives Mr. Federico Furlani, Massimiliano Previdi and Alessandro Loda to the Symphosium “Innovating methods...
continue
Successful conclusion of exhibition IFAT 2008- MUNICH
THE EXHIBITION IFAT 2008, HOLD IN MUNICH FROM 5TH TO 9TH MAY, HAS BEEN SUCCESSFULLY CONCLUDED. MANY VISITORS FROM ALL OVER THE WORLD MET US AT OUR STAND SHOWING PARTICULAR...
continue
SIMEM WILL BE AT ECWATECH 2008 IN MOSCOW (RUSSIA) FROM 3 TO 6 OF JUNE
The 8-th International Trade Fair and Congress "Water: Ecology and Technology" ECWATECH-2008 will take place on 3-6 June 2008 in Moscow in three halls of pavilion 2 of International...
continue

2008 FRUIT OF THE LOOM –Morocco
2008 OMK-GROUP Vyksa – Russia
2008 SMS MEER- Italy
2008 TMK GROUP – Russia
2007 CORAL (partner di Fruit of the Loom)– Honduras C.A.
2007 GREEN VALLEY – Honduras C.A
2007 Olbia - Italy
2007 RESORT EMERALD COVE – St. John’s Antigua (Barbados)
2006 0 DISCHARGE PLANT - Commissioned in India
2006 Trento - Italy
2006 Ukraine - Poland highway
2006 Ukraine - Poland highway
2004 Allahabad bypass – India
2004 High-speed train in Italy
2004 Jaghing RCC dam – Iran
2004 Ozaltin – Turkey
2003 Diga Chalillo – Belize
2003 Diga Koudiat Acerdoune – Algery
2002 Diga Se San – Vietnam
2002 Kurichu dam – Bhutan
2001 Cindere dam – Turkey
2001 Susa dam – Italy
2000 MontBlanc tunnel reconstruction - Italy
1998 Kurichu dam – Bhutan
1997 Ghazi Barotha dam – Pakistan
1997 New Hong Kong airport – China
1997 Super plant - Honk Kong
1997 Toker dam – Eritrea
1996 De Beers Gold mines – USA
1995 Abraham dam – Spain
1995 Xiaolangdi dam – China
1994 CUENCA Centro Sur dam – Ecuador
1994 Olimpic project - Sidney
1994 Petronas Towers - Malaysia
1993 UTEVAL dam – Spain
1992 Buildings - Honk Kong
1990 Eurotunnel

FRUIT OF THE LOOM –Morocco

Dyeing and finishing of cotton knit: On 2008 SIMEM has completed the supply of a complete water treatment plant composed of: Primary water treatment plant for 2500 mc/day, Wastewater treatment plant for 5000 mc/day, Water Recovery plant for 5000 mc/day along with a following lifting water drainage for civil water.