ISOCELL SpA

Simem concrete production station is ready to produce the best quality concrete for the construction of liners that will be employed inside of the new Brenner Base Tunnel. The station is composed by four concrete plants able to discharge into two concrete trucks at the same time; aggregates storage capacity of 2000 m3 with controlled temperature and with an independent charging system for each aggregate; four silos with capacity of 135 m3; four mixers able to produce 2 m3 concrete each cycle. For Brenner Base Tunnel SIMEM also supplied two Eagle plants that are now installed inside of the new tunnel under construction.