ISOCELL SpA

CLIENT: Isocell SpA 

REQUIREMENT: The production of best quality concrete for the construction of liners that will be employed inside of the new Brenner Base Tunnel 

SOLUTION: Four concrete plants able to discharge into two concrete trucks at the same time; aggregates storage capacity of 2000 m3 with controlled temperature and with an independent charging system for each aggregate; four silos with capacity of 135 m3; four mixers able to produce 2 m3 concrete each cycle. For Brenner Base Tunnel SIMEM also supplied two Eagle plants that are now installed inside of the new tunnel under construction.